Position Overview
Aecon-EAC Highway 8 General Partnership (“AEGP8”), a 50/50 consortium between Aecon and Emil Anderson Construction, has been selected by the Province of British Columbia to deliver the Highway 8 Project under a progressive alliance contract model. AEGP8 will work as an integrated team with the province during a development phase to finalize the design, scope and target cost of the project, with construction expected to commence in the second quarter of 2025 and completion expected in late 2026. The scope of work includes replacing two temporary structures with permanent bridges and building approximately 3 kilometres of connecting highway approximately 15 kilometres east of Spences Bridge to improve safety and climate resiliency.
Reporting to the Construction Manager or another Aecon designate, the Structures Project Coordinator will provide field-engineering information to the project management team and sub-trades to ensure construction works comply with all the design drawings, engineering standards, codes and specifications. This is a local site-based position located near Spences Bridge, BC. LOA will be provided.
Jennifer Percival, Industry Employment Coordinator, provides a variety of services to support BCMF members in transitioning to a new career. Contact Jennifer to book a virtual appointment today!